Spring election 2021: Central HS District of Westosha referendum results

Early results in the Central High School District of Westosha $39.6 million building referendum show yes leading.

The district is seeking approval to spend up to $39.6 million to fund building improvements. This includes: Safety and security improvements, construction of additions for a cafeteria, gymnasium, locker rooms and classrooms; renovating and facility improvements, including modernizing classrooms and learning spaces, converting the existing cafeteria into an auditorium and the existing locker rooms into a weight room/fitness center; building systems and infrastructure updates; site improvements; and acquisition of furnishing, fixtures and equipment.

At about 8:45 p.m., with results from 3 of 14 polls reporting:

  •  Yes 949 (54.57%)
  •  No 790 (45.43%)

At about 9:12 p.m. with 5 of 14 polls reporting:

  • Yes 1494 (52.29%)
  • No 1363 (47.71%)

At about 9:42 p.m., with 7 of 14 polls reporting:

  • Yes 1650 (50.29%)
  • No 1631 (49.71%)

At about 10:31 p.m., with 9 of 14 polls reporting:

  • Yes 2264 (51.22%)
  • No 2156 (48.78%)

At about 10:52 p.m., with 14 of 14 polls reporting what may still be incomplete results:

  • Yes 2439 (52.56%)
  • No 2201 (47.44%)

150 Shares

Comments are closed.

  • Follow us on

  • Archives