Twin Lakes School District administrator Joseph Price shared some photos with us that show the progress of work being done on the Lakewood School building this summer:

This is a new classroom door locking system that can automatically be locked with the touch of a button should a “lock down” situation occur. /Contributed photo

Finishing up of masonry repairs and tuck pointing. /Contributed photo

The last stages of the roofing project. /Contributed photo

New water fountains where students can refill their water bottles with filtered water. It also has a counter that tells us how many bottles have been saved. This is an eco friendly unit and students will have access to purified water. /Contributed photo
Looks great! I cant wait!